Hi everyone. As shown in the picture, i have finished the last board at the stairs, which overhangs badly. Obviously this needs a nosing, which the customer has provided (incizo) Any suggestions on how to sort this? Thanks in advance Sent from my D6503 using Tapatalk
Should of started the floor with base plate on there as the floor locks in to the base plate then u get a nice finish. are you putting carpet on stairs or did they go for laminate?
Yeah i would have started there, but someone else had already started at an opposite doorway! The carpet ends on the top riser. Sent from my D6503 using Tapatalk
Oh I see., then u have to cut the floor and put the carpet on then check which incizo profile shape can go on. Normally T bar . But use thewhite plastic track as its safer to fix.. Cut the floor back from the step about 20mm.
Great, thank you! That's the lines I was going down. I did ask for that but apparently was ignored by the carpet guy lol Sent from my D6503 using Tapatalk