How would you build this back up. Uplifted sand and cement. Got to Dpm it too. It’s running from 3mm to 3” lol.
80mm deep? i would put a dpm sheet down OR liquid dpm and then Mapie topcem. Be dry in 2 weeks to fit on. OR DPM sheet, eco pearls and then chipboard over top with tongue and groove PVA together and tied into the old chipboard floor.