Hi all, Got a hallway extension to do in lvt, running across the width is the join where the new concrete slab meets the old existing concrete slab. The slabs are the same height ish and no gap between them. Question is, should/is this an expansion join and is it a weak point for moisture to escape? New base is still damp so was thinking dpm the whole lot then screed thanks for any advice