Repair

Discussion in 'Subfloor Preparation' started by Neilydun, Oct 15, 2020.

  1. Neilydun

    Neilydun Well-Known Member

    2,859
    1,212
    113
    Ive been asked to carry out a repair/infill.
    An internal blockwork wall has been removed and left a trench which is 45m long x 200mm wide x 100mm deep
    There is a physical membrane below, so nothing to worry about there.
    So, what would you use ?
     
  2. Spacey

    Spacey Super Moderator Staff Member

    6,516
    1,878
    113
    Feather finish :D
     
  3. Rugmunching

    Rugmunching Well-Known Member

    3,656
    629
    113
    Gripfill
     
  4. Paul webb

    Paul webb Well-Known Member

    1,115
    139
    63
    Maybe concrete blocks to fill in the bulk of it first, are you screeding after?
     
  5. Neilydun

    Neilydun Well-Known Member

    2,859
    1,212
    113
    Come on, I would expect no less than 888 from you !
     
  6. Neilydun

    Neilydun Well-Known Member

    2,859
    1,212
    113
    Do they do it pumpable now ?
     
  7. Neilydun

    Neilydun Well-Known Member

    2,859
    1,212
    113
    Its a mixture.
    Some loose lay click, some c&c vinyl.
     
  8. Neilydun

    Neilydun Well-Known Member

    2,859
    1,212
    113
    I was thinking 3 options.
    Ardurapid or similar
    A35 sand & cement
    Standard sand & cement
     
  9. Spacey

    Spacey Super Moderator Staff Member

    6,516
    1,878
    113
    888s :rolleyes:
     

Share This Page