    Corridor 30m x 2.20, chipboard down, what would you suggest for prep, safety going down and they don't want to see any deviation on floor..
     
  2. merit

    merit Well-Known Member

    8,208
    1,676
    113
    4 - 6 mm ply then renovation screed?
     
  3. markyw

    markyw Well-Known Member

    220
    29
    28
    6mm the 700?
     
  4. coolevilangel

    coolevilangel Well-Known Member

    4,299
    912
    113
    if its within the budget id try and swing 9mm and 700 tbh
    But it'll prob be the old saying
    'They want diamonds but only willing to pay for coal'
     
  5. SandyFloor

    SandyFloor Well-Known Member

    962
    289
    63
    The only way I know would guarantee perfection is 6mm ply then 700. However if the chipboard is really good I don't see why 6mm ply and feather won't do it.
     
  6. mjfl

    mjfl Well-Known Member

    6,259
    1,593
    113
    I've been asked to prep only as the guys who's job it is aren't sure that they are able to do it.. WHAT...
    I said 6mm, prime then fibre screed with whatever brand or ply then feather but being that length I was concerned that you may see a variation if just feathered...
     
  7. merit

    merit Well-Known Member

    8,208
    1,676
    113
    If the floors not spot on and there's any light comin in that will show. Flood it with levelling compound
     
  8. merit

    merit Well-Known Member

    8,208
    1,676
    113
    ha, you will see the variation in the surface of the **** ply let alone the subfloor. Unless you can get decent stuff that is
     
  9. mjfl

    mjfl Well-Known Member

    6,259
    1,593
    113
    My thoughts too
     
  10. SandyFloor

    SandyFloor Well-Known Member

    962
    289
    63
    Sounds like you're in a vulnerable position I wouldn't be happy with. Any problems with the fitting could easily be blamed on the prep and if these guys aren't capable of prepping themselves you have to question their competence in fitting. If you do it go the full bhoona with 700 or similar
     
  11. g4l

    g4l Well-Known Member

    1,160
    300
    83
    Screeding over ply seems overzealous to me. I don't claim to be perfect in feathering but I've never had any problems with 9mm and feather
     
  12. mjfl

    mjfl Well-Known Member

    6,259
    1,593
    113

    Exactly
     
  13. mjfl

    mjfl Well-Known Member

    6,259
    1,593
    113

    Have you done a long corridor in 9mm and feather?
     
  14. coolevilangel

    coolevilangel Well-Known Member

    4,299
    912
    113
    if theres a lot of light, you'll see Everything!
    If your only responsible for the sub prep, def belt and braces the thing
     
  15. g4l

    g4l Well-Known Member

    1,160
    300
    83
    I've done long corridors in 6mm and feather without worries. I changed to 9mm a few months back and wouldn't hesitate to ply and feather anywhere.
     
  16. SandyFloor

    SandyFloor Well-Known Member

    962
    289
    63
    Actually the more I think about it; if you said you won't do it unless you do the whole thing, what would they do?
     
  17. mjfl

    mjfl Well-Known Member

    6,259
    1,593
    113
    Probably say ok
     
  18. coolevilangel

    coolevilangel Well-Known Member

    4,299
    912
    113
    In all honesty you'd easily manage it if the floor was completely flat & level etc
    Mario, Any idea what state the chipboard is in currently?
     
  19. mjfl

    mjfl Well-Known Member

    6,259
    1,593
    113
    Spot on, but not seen it myself... ooohh
     
  20. SandyFloor

    SandyFloor Well-Known Member

    962
    289
    63
    Even if the chipboard is good you'll need to look at it for undulation too. Depends a lot on the light sources too of course
     