hi lads,what do you recommend,70sm solid oak to crete floor,needs dpm and poss screed, only prob job over 35 miles away so was thinking l3 but its not got a high enuff compression so what would you do to not have to call back 2 or 3 times. normaly would 1k turbo and latexplan but thats at least 2/3 trips . going to use floorwise 539 adhesive
how come you dont wanna go back a few times ? time/fuel?, my work is hardly ever close to home these days so a lot of travellin, i just add a bit on to cover fuel costs an im not bothered about travellin
Yes and yes want to dpm and screed in one day im lazy like that and why not if you can do it why make more time and work if you dont have to
why cant you dpm and screed in same day? 1k Turbo needs just over 1 hour to dry before you can prime and screed? also what is L3 golds compression strength ? i had a look and couldnt find it?
no one can find l3's compression strength, think that's the problem if it was high enough would be ideal way to do bonded wood floors
I read the spec on the l3gold DPM a while ago and remember it said not suitable for bonded wood floors.