    Another thread just reminded me of something unpleasant that caught me out a couple of months ago. The builder had constructed a small extension c/w patio doors with chipboard floor and overlaid it with well screwed down quality 6mm ply and it appeared spot on. Shortly after I fitted Amtico black tiles some little bumps were appearing. They turned out to be where some of the screws had displaced and raised the ply. The bumps were minute and couldn't even be felt by touch but owing to the light and the finish of the tile every tiny flaw showed up. It caught me out as I always use my nailer which doesn't raise the ply. Cost me a days work for two and two boxes Amtico to fix.

    So all screwed down ply gets sanded down all over now.
     
  2. Pigsarse

    Pigsarse Well-Known Member

    422
    128
    43
    Do you feather over ply ?
     
  3. Spacey

    Spacey Super Moderator Staff Member

    6,503
    1,881
    113
    I only screw 9mm & nail 6mm !

    Never had these problems of fixings showing through ?
     
  4. SandyFloor

    SandyFloor Well-Known Member

    962
    289
    63
    Just the joints but I'm not sure it would have made any difference as they were high spots. If it seems dead flat I don't see the point in messing with it
     
  5. SandyFloor

    SandyFloor Well-Known Member

    962
    289
    63
    Either had I. Black Amtico tiles and big windows aren't very forgiving.
     
  6. Spacey

    Spacey Super Moderator Staff Member

    6,503
    1,881
    113
    Natural light will show up any imperfections in the floor !
    Do you flexy screed your ply ?
     
  7. Pigsarse

    Pigsarse Well-Known Member

    422
    128
    43
    Sound like poor quality ply to me where some of the layers are separating . Had it before mate. If it was me fitting amtico I'd only use the top grade ply , yeah it costs more but you don't get any issues like this.
     
  8. Pigsarse

    Pigsarse Well-Known Member

    422
    128
    43
    Flexi screed? Better off using a thicker top grade 9mm ply which will give more stability screwed down well, then feather over the lot . Be like a billiard table.
     
  9. Spacey

    Spacey Super Moderator Staff Member

    6,503
    1,881
    113
    I always use 9mm unless there's issues with levels & I also feather but when the floor still isnt perfect I flexy screed.
    Amtico & know karndean are recomending flexy screeding all ply & imo it does give a much better finish !
     
  10. UVcure

    UVcure Well-Known Member

    481
    338
    63
    we always flex or feather finish ply all over, its not worth the problems if they do show afterwards , prevention is better than the cure
     
  11. SandyFloor

    SandyFloor Well-Known Member

    962
    289
    63
    I've never seen the point of flex screeding over a plyed chipboard floor that is already smooth and flat ....it can't make it better but possibly make it worse and at a price. Chipboard isn't hard to establish if there are likely to be problems with light by using a fine straight edge along with some experience. Sometimes the joints may be slightly raised which I sand down prior to plying. Sometimes there might be a slightly high joist underneath which may need a flexy screed all over. Very good point with the feather screed but I reckon it is good to fill low spots and doesn't eliminate high ones. Anyway the issue is sorted as I sand over all surfaces ( including chipboard joints prior to plying ) using my new toy as mentioned in another post and the results have been excellent.
     
  12. bournemouth

    bournemouth Super Moderator

    2,015
    766
    113
    I always flexy ply aswell 3mm ply and flex cost not much more for a better finish
     
  13. SandyFloor

    SandyFloor Well-Known Member

    962
    289
    63
    What flexy are you using? Stopgap 700 sure aint cheap? I mean a 12-14 sq.mtr kitchen would need three bags plus the time to screed the job
     
  14. dazlight

    dazlight Super Moderator

    7,212
    1,707
    113
    Touch wood since using SP101 ply I've not had a problem. So I'm back to
    Sort floorboards out, ply ,feather joints.

    The 60m2 Amtico job I have just ripped up was 9mm plywood feathered joints. All delaminated.
     
  15. Pigsarse

    Pigsarse Well-Known Member

    422
    128
    43
    I know daz me too. I use that top grade ply its the dogs danglies. Yeah it costs more but it saves u in the long run having problems. Plus if you all use flexy screed that's not cheap. All you need is a tight coat of feather on top and away you go.
     
  16. bournemouth

    bournemouth Super Moderator

    2,015
    766
    113
     
  17. Carpetfingers

    Carpetfingers Well-Known Member

    166
    27
    0
    agreed me too, but getting the extra coin for it is tricky especially when others will bang it in much cheaper.
     
  18. bournemouth

    bournemouth Super Moderator

    2,015
    766
    113
    Do any of you lads have folder with your jobs to show customers if so do you have a section of when jobs go wrong? obviously not your own, but explain to the customers about prob seeing board outline in a couple years etc then a couple of pics of boards showing through normally helps them part with a bit extra xash
     
  19. Spacey

    Spacey Super Moderator Staff Member

    6,503
    1,881
    113
    I get a good price on 9mm probably what most pay for 6mm
     
  20. SandyFloor

    SandyFloor Well-Known Member

    962
    289
    63
    Interesting thought. I always talk about what can happen with duff plywood or going without a dpm but never thought about the gory pics. My first thought is to get jobs by talking positively but I suppose you you're planting the doubt and then offering the solution
     