    Thought I'd start I thread on builders who don't care and make our life hell.

    This job was ice and clean then I walked into this.
    ImageUploadedByTapatalk1418833589.833760.jpg ImageUploadedByTapatalk1418833601.568329.jpg ImageUploadedByTapatalk1418833612.839334.jpg View attachment 7806
     
  2. Neilydun

    Neilydun Well-Known Member

    2,887
    1,223
    113
    Ive posted this before, but fits into this thread nicely.

    [​IMG]
     

    Attached Files:

  3. dazlight

    dazlight Super Moderator

    7,203
    1,704
    113
    Lol classic that.
     
  4. merit

    merit Well-Known Member

    8,208
    1,676
    113
    They don't tidy up a ****ing thing. Had a good example last week where we did the ground floor uplift carpet and underlay take off skirting and fit new floor. All rolled up, cut up and taken away. Plumbers did the basement and made a right mess. Holes in the walls even one while piece of architrave taken off, broke the kick board, cushion floor taken up in whole areas and left outside in the rain, cut all the cement board and left it to turn to sludge outside. Rubbish pile looked like it was ready for bonfire night and we ended up removing it because they didn't have time to come back before Christmas. Arseholes
     
  5. Jambo

    Jambo Well-Known Member

    613
    348
    63
    Yes, a builders definition of "ready" leaves a lot to.be desired. They tend to have more of an "out of sight, out of mind" mentality :(
     
  6. pf flooring

    pf flooring Well-Known Member

    1,600
    602
    113
    daz is that screed over floor boards I see in pic 2 lol, builders are the scourge of my life berkley homes seems to be getting worse by the day they have utter numptys running these sites, had 10 townhouses to do, we have had no heating till after its fitted cleaners in whilst we are fitting it, tapers and joiners whilst im latexing it and plots that havent seen a broom in a month, then they have the audacity to moan if we take a little longer to finish each one!
     
  7. dazlight

    dazlight Super Moderator

    7,203
    1,704
    113
    Yes mate, we did that. Just to build the floor up before the ply goes down. Level flex
     
  8. mjfl

    mjfl Well-Known Member

    6,259
    1,593
    113
    That sounds like the days I used to do Persimmon homes... 10 sites on the go and nothing ever ready.. All trades in at once.. I loved it when they had their tea break or lunch break.. lol I used to lock them out so they couldn't get back until they found the forman, oh, sorry to late I've screeded.. oops..:rolleyes:
     
  9. g4l

    g4l Well-Known Member

    1,160
    300
    83
    Leaving UFH on seems to be a current favourite at the moment :(
     
  10. pf flooring

    pf flooring Well-Known Member

    1,600
    602
    113
    Learn something new everyday, didn't realise you could do that.
     
  11. dazlight

    dazlight Super Moderator

    7,203
    1,704
    113
    Used to do it with green bag years ago. Before fibre screeds came out. Mix it semi dry then go over whole floor of cupped floorboards.
     
  12. Neilydun

    Neilydun Well-Known Member

    2,887
    1,223
    113
    Arrived on site the morning, and found this

    [​IMG]

    [​IMG]

    [​IMG]

    Rather than wasting my time waiting for them to sort it, we just cracked on

    [​IMG]

    [​IMG]
     

    Attached Files:

  13. willo87

    willo87 Well-Known Member

    104
    38
    28
    God that's nice of them, they just don't care got lan school this week 120sq meter on my own says all been ply down get there, and they gone over all existing carpet bloody awful says its to sound insulation haha.
     
  14. merit

    merit Well-Known Member

    8,208
    1,676
    113
    Freckin hell where you working? On the moon?
     
  15. Neilydun

    Neilydun Well-Known Member

    2,887
    1,223
    113
    Yep mate, 'one small step for floorlayers !'
     
    Last edited: Dec 18, 2014
  16. dazlight

    dazlight Super Moderator

    7,203
    1,704
    113
    Mad sub floor that Neil, what screed did you use? Was it pumped
     
  17. merit

    merit Well-Known Member

    8,208
    1,676
    113
    What you fitting there?
     
  18. mjfl

    mjfl Well-Known Member

    6,259
    1,593
    113
    Rubber tiles I think
     
  19. Neilydun

    Neilydun Well-Known Member

    2,887
    1,223
    113
    We used Level It Base. Not used it before, but up to 50mm in one pour.
    About 120sq. m and about 80 bags used, all mixed up by Charlie !

    Ive never pumped screeds before. Jobs never seem quite big enough to justify buying one, although i`d like to give it a try.
     
  20. Neilydun

    Neilydun Well-Known Member

    2,887
    1,223
    113
    Gerflor Gti interlocking vinyl tiles. I will get a few pic`s up when its on the floor.
     