Standards!

Discussion in 'Random Chat' started by Glenn H, Jun 22, 2016.

  1. Glenn H

    Glenn H Well-Known Member

    645
    140
    43
    Went to a new site todayou for a new firm. Huge building works being carried (won't say where and who contacted us) but the floors were at best atrocious!! Vinyl with more bumps and bubbles than an aero bar. It was unreal.

    The floorlayers before had came in and smashed out all the meterage, barely touched on the welding, what bits were done were nasty/shocking. Welds almost an inch wide and as straight as a snake. Felt embarrassed to be near the floors that were laid incase other trades thought it was me. We promised the firm that we would carry out a few days of repair work/snags and we will honour what was promised but I don't think I'll be hanging around for too long there if that's the accepted standard of works. Rant over
     
  2. Glenn H

    Glenn H Well-Known Member

    645
    140
    43
    And if I remember, I'll post some pics of the bubbles and welds for everyone on here to have a chuckle
     
  3. dazlight

    dazlight Super Moderator

    7,203
    1,704
    113
    Sadly that's the norm in a lot of jobs now. They get in cheap lads who do a shit job


    On tapatalk HD
     
  4. Glenn H

    Glenn H Well-Known Member

    645
    140
    43
    They pulled about 30k from job and cleared off leaving a ton of snags and unfinished work. Unreal!!
     
  5. Neilydun

    Neilydun Well-Known Member

    2,887
    1,223
    113
    Ive seen that a million times before.
    Its a pet hate, when I use to get sent to sort out shit like that, and the site agents have always been promised that you can get it sorted.
    Daz is exactly right, some contractors just use the cheapest quote, and its true 'pay peanuts, get monkeys !'
    I have been lucky and found a few main contractors who appreciate they have a pay a little more, to get the right finish.
     
  6. Neilydun

    Neilydun Well-Known Member

    2,887
    1,223
    113
    Guys like that will always get the big area`s on the floor, and leave the cupboards, toilets, welding, stairs get it invoiced and run.
    The contracts manager should have seen that though, and put a stop to it.
     
  7. TonyA

    TonyA Well-Known Member

    327
    118
    43
    Contract manages only think the sun shines out of the arses of a new team that comes in tears the arse out of a job for peanuts.They short sightedly think they are saving the boss money and adding to their bonuses until the first tug .Then it all unravels fast and becomes expensive to put right or it has to be replaced.
     
  8. Glenn H

    Glenn H Well-Known Member

    645
    140
    43
    It was a joke. An absolute state. I'm sure most fitters turn up and do maybe a few days then think sod this I'm off. This was the first the job the company wanted us to do and I can see why most fitters ain't willing to stick around to do the odds and sods. Gotta take the rough with the smooth in this game tho sometimes huh
     