So, I spent my weekend getting ready to build, an office and store. This is how we started Great breaker, could use it on some of the sites we work on. 2.5m Footings, to regs Luckily, my neighbor let me use his drive for access. 5x 8 wheeler loads out Have you ever used a screed pump ? This one has plenty of reach
Pour it in Pump it out. 3x loads 24 cube Ok, so it actually took 3 1/2 really hard days, but think it will be worth it.
So, its taken a year, but its done, and by us, when we have a day off here and there. Walls, roof, and doors included for convenience Last of the drainage in yesterday, which was a right twat. No fall, so had to fit a pump system. Putting the garden back together today, so wife should be happy !