Prime?

Discussion in 'Subfloor Preparation' started by Roidsey, Nov 25, 2017.

  1. Roidsey

    Roidsey Well-Known Member

    164
    13
    18
    If putting down ardex na then dpm then na would you prime on top the dpm?
     
  2. merit

    merit Well-Known Member

    8,222
    1,681
    113
    You don’t have to if your latexing the day after the dpm. If it’s been walked all over pr site probably best to prime


    Sent from my iPhone using Tapatalk
     
  3. Roidsey

    Roidsey Well-Known Member

    164
    13
    18
    So basically if its clean you dont need to no?
     
  4. merit

    merit Well-Known Member

    8,222
    1,681
    113
    If it’s clean and within 48 hours of the dpm curing


    Sent from my iPhone using Tapatalk
     
  5. Roidsey

    Roidsey Well-Known Member

    164
    13
    18
    Thanks merit, also if laying lvt on using ps can you pull the tiles back without pulling the screed off
     
  6. Spacey

    Spacey Super Moderator Staff Member

    6,503
    1,881
    113
    Always prime DPM regardless And don’t use PS for LVT
     
  7. Spacey

    Spacey Super Moderator Staff Member

    6,503
    1,881
    113
    And also don’t use NA if you can help it
     
  8. Roidsey

    Roidsey Well-Known Member

    164
    13
    18
    Why not use those 2 products space and what ratio would you mix the primer
     
  9. Roidsey

    Roidsey Well-Known Member

    164
    13
    18
    Spacey sorry
     
  10. Spacey

    Spacey Super Moderator Staff Member

    6,503
    1,881
    113
    Best way to prime DPM is to yuck a load of kiln dried sand on it before it dries
     
  11. Spacey

    Spacey Super Moderator Staff Member

    6,503
    1,881
    113
    Need to use a sand type primer like Ardex P4 Uzin 280 Mapei Prim grip or as I just said yuck sand on it
     
  12. Spacey

    Spacey Super Moderator Staff Member

    6,503
    1,881
    113
    NA does a Job but the flow is terrible I’d personally use CL screed if it had the be an Ardex product
     
  13. Roidsey

    Roidsey Well-Known Member

    164
    13
    18
    I'm new to this it's a bloody lot to take in!, a lot of learning so appreciate all your comments, so many different products!, why don't you use ps spacey?
     
  14. Roidsey

    Roidsey Well-Known Member

    164
    13
    18
    And I thought you didn't need to prime with na?
     
  15. Spacey

    Spacey Super Moderator Staff Member

    6,503
    1,881
    113
    PS is very weak and no better than a tackifier
    LVT expands and contracts with temp change
    More so with wood plank and large tiles so with PS you can get gapping or tenting
     
  16. Spacey

    Spacey Super Moderator Staff Member

    6,503
    1,881
    113
    You don’t have to but it’s better to
    You do not have to go to work but life’s better if you do
     
  17. Roidsey

    Roidsey Well-Known Member

    164
    13
    18
    Ha your right there staying home with the misses would be a bloody nightmare!
     
  18. Roidsey

    Roidsey Well-Known Member

    164
    13
    18
    So what adhesive would you recommend
     
  19. Spacey

    Spacey Super Moderator Staff Member

    6,503
    1,881
    113
    Exactly mate its possible but you don’t get the piece of mind :rolleyes:
     
  20. Rugmunching

    Rugmunching Well-Known Member

    3,871
    678
    113
    Ke66 hey spacey :D
    Ive been using ardex AF175 - similar to the Ke66
     

Share This Page