Last one I came across came up with a 4 inch scraper it was so well bonded...... 50m2 all up inside about 45mins
Last time I was on a site and asked what levelling compound the main contractor used the answer I got was....what Evers the cheapest. Not a good start Sent from my iPhone using Tapatalk
Not got from the base up by the sound of it. Probably out of date builders merchant cheap levelling compound with a pva primer if any at all Sent from my iPhone using Tapatalk
Well I don’t know the answers to all those questions. Nobody else has a problem with their floors, some had the floor layers who the builders use to put their lvt and no issues, some used their own floor layers like us and no issues, seems odd that the Hall way is fine and all was done together, all very confusing
Love it when my boss says the builders have screeded or plyed the floor you don't need to prep it Sent from my SM-G950F using Tapatalk
It is caused by the sun coming through the windows and no high temperature adhesive used in these instances it's better to use 2 part epoxy in areas likely to be in direct sunlight.