Got loads on over the next 10 days. 2x different sites, both on a 10 shut down for refits, and lots to do at each site. Didn`t really need to find this Its the same over 150 sq. m, I think it was just the vinyl holding it together
The MC did a survey before hand, and knew the floor was bad. There is a 400mm void, which was going to be filled with insulation, 100, 100,100, 50 then a concrete screed, Ardex A38. Latex after 24hrs, then fit. Problem is, the internal walls are built on the existing floor, not the slab. Nightmare ! Now, we have to uplift, de-nail the joist, 18mm, then probably 6mm, and feather. Lots to do in ten days. 200 sq. m of 2x layer 10mm rubber. 280 sq. 15mm regupol & 50mm rubber slab, nosings around edge 300 sq. cap & cove 800 sq. click system, with 80 lin of clip top, and beading to perimeter and various repairs to existing floors Normally that would all be ok, but my team is split, as we another site with a similar install at another site. Some long days ahead
Made some good progress, 18mm fixed with 1st fix paslode, great tool. Overlaid with 6mm. Still some bad bits Should be finished tomorrow, can`t wait to get away from there
Nice one neily looking fwd to seeing the fin pics. Ballache u didn’t need tho Hope u chgd them good for it!