    Has anyone fitted on this stuff from mapei. It’s been put down over underfloor heating pipes at 85mm. Mapei say it only takes 1 day to dry but it’s been down 45days. Haven’t heard of it before but thought it sounded to good to be true. I need to stopgap 300 it and fit Karndean. Cheers
     
  2. merit

    merit Well-Known Member

    8,208
    1,676
    113
    You need to ring them and let them know what your installing because that drying time varies depending on what your installing. It’s more like 7 days and still a bit risky for my liking


    Sent from my iPhone using Tapatalk
     
  3. Lvtman

    Lvtman Well-Known Member

    220
    54
    28
    I’m waiting for them to get back to me with a time That they can do a site visit. Will just use what they reccomend just used to working on roughly 1mm a day drying times and then you get this lol

    technical just told me it’s dry in a day at 85mm
     
  4. Neilydun

    Neilydun Well-Known Member

    2,887
    1,223
    113
    Some screeds will dry in that time. We have fitted on 100mm after 48hrs, lots of times, and its been fine. I think they use Ardex A38.
    Topcem is another fast drying screed
     
  5. merit

    merit Well-Known Member

    8,208
    1,676
    113
    Yeah we’ve put karndean on topcem after 3/4 days and it’s been fine. Was a small area though 4m x 4m 80mm deep


    Sent from my iPhone using Tapatalk
     
  6. Distinctive Adam

    Distinctive Adam Well-Known Member

    1,726
    503
    113
    Speak to mapei it should be dry by now, we have an additive that dries sand/cement in 24 hours at any depth within reason.
     
  7. Lvtman

    Lvtman Well-Known Member

    220
    54
    28
    Cheers for the replies. There going out Thursday. It’s 60sqm sounds like it shouldn’t be a problem then.
     