How long to let new concrete dry before using self levelling?

Discussion in 'Subfloor Preparation' started by HappyChimp, Aug 1, 2020.

  1. HappyChimp

    HappyChimp Member

    5
    0
    1
    Hi,

    I'm about to add 60mm of concrete to a back room to bring it level with the rest of the house. I was planning to use a self levelling compound on the last 5mm to get it as level as possible (don't feel too confident using screed myself).

    Can anyone advise how long I would need to let the concrete dry before applying the self leveller?

    many thanks
     
  2. Spacey

    Spacey Super Moderator Staff Member

    6,503
    1,881
    113
    4 weeks Before you can do anything to it
     
  3. HappyChimp

    HappyChimp Member

    5
    0
    1
    Ah pants thats about 3 weeks longer than I'd hoped o_O Am I right in thinking I could screed it after 48hrs?

    Ta
     
  4. tarkett85

    tarkett85 Well-Known Member

    3,183
    484
    83
    Roughly 1mm a day to 50mm anything more double the time as a rough guide to naturally dry out in perfect conditions, or as was said grind off the laitence, wait 4 weeks and perform a moisture test then take it from there.


    Sent from my iPhone using Tapatalk
     
    • Like Like x 1
    • Winner Winner x 1
    • List
  5. tarkett85

    tarkett85 Well-Known Member

    3,183
    484
    83
    No you can’t


    Sent from my iPhone using Tapatalk
     
  6. Rugmunching

    Rugmunching Well-Known Member

    3,874
    678
    113
    :D :rolleyes:
     
  7. HappyChimp

    HappyChimp Member

    5
    0
    1
    Good to know thanks for the info
     