Right guys new builds . The slabs are wet .they have lignite Who’s getting the jumpax out and who’s putting faith in a system ? Bare in mind your readings are wet I know some brands have systems for below 75 but what are you guys doing if it’s above ? Letting it dry or getting on with it . ? out of curiosity can anyone give me an indication as to how long a slab would take to drop in % on hygrometers to dry say 5% .to get to below 75 . I’m just wondering what u guys are doing to battle this as it’s becoming rife
1mm a day up to 50mm anything over that double the drying time, grind it back RE3 primer, blind it, NA, Dpm1c, NA and hope for the best Sent from my iPhone using Tapatalk