Todays horrendous job is brought to you by interface carpet tiles with a little help from the campest designer I've seen Please god let me do one normal good looking job this week
A compleaty Random lay with no repeating patterns, the amount of times I had to change tiles as without realising started check a boarding them nice to cut tho
The designer was watching the whole time with foreman to make sure there's no repeated pattern I only did 80 sq today that was bad enough listening to change this one please, change that one, can we stop and check please, feel sorry for whoever has to go next week and fit the last 400 sq while listening to him
Thats just insane Bourne the terminolgy random means exactly that and thats what I said when a designer tried that with me he went round after we had installed them an put post it notes on the ones he wanted changing 68 notes in 600m2. An get this I went round and removed all the notes without replacing any of the tiles he turned up at lunchtime to have another look and said thats better don't you think an with a big grin an a silent chuckle I said yep sure is fella see ya. Idiots.