Few unusual jobs last week

Discussion in 'Pictures' started by UVcure, Jul 23, 2013.

  1. UVcure

    UVcure Well-Known Member

    481
    338
    63
    did two studios sets last week for a well known TV program, one was because the other actors walking off set kept making the floor squeak and it could be heard on camera, so we had to uplift the chipboard floor, take out the metal clips and any screws,put in timber supports with 4mm foam added, then lay 18mm t&G ply and then lay carpet tiles and cheap cushion floor to make it look like a council flat,
    photo 2[1].jpg photo 2[28].jpg photo 1[32].jpg photo 4[22].jpg
     
  2. UVcure

    UVcure Well-Known Member

    481
    338
    63
    Then we did this one, which was flood damage, but couldn't change the set,
    so uplifted vinyl and chipboard, cutting up to the set, then layed 18mm t&g on 6mm foam, used schonox APF flex and then laid Tarkett elite


    IMG_1029.jpg IMG_1032.jpg photo 1[24].jpg IMG_1617.jpg IMG_1041.jpg IMG_1042.jpg photo 2[26].jpg
     
  3. UVcure

    UVcure Well-Known Member

    481
    338
    63
    nice easy one

    IMG_1048.jpg IMG_1049.jpg IMG_1052.jpg IMG_1053.jpg
     
  4. UVcure

    UVcure Well-Known Member

    481
    338
    63
    and then the one that when wrong, was just going to be uplift Vinyl, latex and apply UV paint and cure, when we uplifted, the Latex had not been primed to the F75 DPM and was too loose to leave, so had to hack the lot off, then has anybody tried to use 300 down a ramp at 6 to 8mm thick, just kept running down hill, the boys worked the night shift and i went in the day to UV prime and paint, did a few things wrong because of the subfloor and ended up chasing our tails all day, was really had to get it perfect.
    going to put it right again this weekend, as they say life's a learning curve.
    IMG_0755.jpg IMG_0757.jpg IMG_2662.jpg DSC01505.jpg IMG_0760.jpg
     
  5. dazlight

    dazlight Super Moderator

    7,218
    1,711
    113
    Great photos mate . Good seeing the different stages.
     
  6. merit

    merit Well-Known Member

    8,222
    1,681
    113
    When you remove chipboard do you always replace with plywood? What sort of work do you find needs be under the chipboard. I've got 2 chipboard subfloors that need ripping out and replacing.
     
  7. mjfl

    mjfl Well-Known Member

    6,259
    1,593
    113
  8. SandyFloor

    SandyFloor Well-Known Member

    962
    289
    63
    What programmes are they?

    A joiner mate of mine built the stage for ' You've Been Framed' when Lisa Riley presented it. He claims he was told to built it strong enough you could park a car on it!
     
  9. UVcure

    UVcure Well-Known Member

    481
    338
    63
    Always replace chipboard with ply if I can, it's not that much difference with the cost and you don't get as many problem with damp, or squeaking, why have the gone.?whats the problem Do you know if they are on joists . What you putting on them as a finish?
     
  10. UVcure

    UVcure Well-Known Member

    481
    338
    63
    Was that for Lisa Riley benefit or the car
     
  11. g4l

    g4l Well-Known Member

    1,160
    300
    83

    Didn't someone on here say they used stopgap800 for a sloping area in a cinema?
     
  12. merit

    merit Well-Known Member

    8,222
    1,681
    113
    There is an area that has given way in the floor, not on joists it's almost as if its water damage or they have taken the ply over a hole and it is now showing. I putting lvt back down
     
  13. UVcure

    UVcure Well-Known Member

    481
    338
    63
    normally when doing ramps we would use green bag and 128/114 and mix it up a little thicker, but because this was for a resin i needed something with a higher Newton strength, forgot about the flow properties, didn't help that the screed had been done with a shovel!! mind you by the time we had finished it looked like we had used one,
    will look at the 800 thanks
     
  14. UVcure

    UVcure Well-Known Member

    481
    338
    63
    so its on screed /concrete
    maybe they have laid it on screed and either the floor was uneven, or maybe no DPM and the moisture has just gone into the Chipboard,
    i would make good the bad bits in the screed, lay plastic DPM, 6mm foam or 4 depending on screed , T&G 18mm ply sticking all the joints, see what the surface is like, and movement? , then either sand the joints, feather finish or prime & coat the lot with 700 flex/APF and then lay your LTV
     
  15. welsh wood

    welsh wood Well-Known Member

    649
    235
    43
    sweet work as ALWAYS uvc, sweet... :cool:
     