    Hello Chaps

    I've got a job in the pipeline to lay/sand/finish parquet flooring to approx 33m2 thru lounge/diner.

    The room is having a new concrete subfloor 100mm sand/cement jobby, the customer wasn't entirely thrilled when i mentioned that the concrete will need approx 150 days to properly dry before a new wood floor is laid...he's since spoken to his builder who has come back to him with the following spec...

    Please could you ask your flooring company that if we did the following
    would it reduce the drying time of the floor?

    Place Viscreen under 100mm concrete, then place timber batons with a 70mm
    Celotex (or equivalent) insulation in between, topped off with 22mm flooring
    grade chipboard.


    Any thoughts on the above possible solution boys ??

    He's thinking of having a 500mm + Chevron Parquet laid.

    Regards Gary
     
  2. mjfl

    mjfl Well-Known Member

    6,259
    1,593
    113
    it's still got to dry out
     
  3. gazhugs

    gazhugs Well-Known Member

    238
    122
    43
    Completely agree, no way i'm gonna do any shortcuts to help the builder out cos it will invariably bounce back to me when the floor starts going wrong...
     
  4. Trimmer

    Trimmer Well-Known Member

    1,464
    490
    83
    Tell the builder to use topcem pronto from mapei. Can lay on it after 4 days. I did an engineered herringbone a few years ago and laid over a 60mm one with ufh after 10 days.
    Does something with the moisture. The term I remember is encapsulates it
     
  5. merit

    merit Well-Known Member

    8,217
    1,678
    113
    How did you get a price for it Trimmer? I asked cfs for weeks and they just couldn't sort it out?? Lost the job in the end due to the poor service from cfs!
     
  6. Neilydun

    Neilydun Well-Known Member

    2,890
    1,225
    113
    I bought a pallet of them a few months back. Had to moan to get the price, but was delivered next day.
    There terrible for getting back with prices !
     
  7. gazhugs

    gazhugs Well-Known Member

    238
    122
    43
    Hi Trimmer

    How long after the slab is laid before you go over it with the Mapei Topchem Pronto ??
     
  8. UVcure

    UVcure Well-Known Member

    481
    338
    63
    Is it a new concrete slab with a bonded or unbonded sand and cement screed,
    What the builder has specified you could lay on in my opinion, but would make him use T&G fair face ply
    Or use an unbonded quick drying screed with plastic DPM interlayer
    Lots of quick drying screeds, Ardex 35 cement mixed with sand,
    Drys to walk on in a couple of hours, have laid Lino on 100mm screed next day
    Mapie, uzin or k screed
     
  9. merit

    merit Well-Known Member

    8,217
    1,678
    113
    So bad....must of asked the rep 6 times over the course of 2 weeks, waiting for Mapie to get back to me, couldn't work out the ratio, didn't get a price. The Portland cement would of dried by the time that lit sorted out a rapid screed
     
  10. mjfl

    mjfl Well-Known Member

    6,259
    1,593
    113
    Well, you didn't ask the right people did you now.. :cry
     
  11. merit

    merit Well-Known Member

    8,217
    1,678
    113
    Mate, I should of gone to the main man!
     