Yes the guy who did the screed used a spirit level. The existing concrete floor wasn't that level, about 2-3cm difference across 16sqm
Forgot to mention the floor is a tongue and groove system. The necessary expansion gap was left for the floor to expand. It was fitted in late...
Hello, We have had a new floor laid of engineered wood over screeded floor and existing concrete floor, all a continuous area. The floor is very...
Would we be able to fit the flooring and cut holes for the legs to allow for natural expansion and no weight on the floor? The reason we want the...
Absolutely not taking the Mickey, I misread what you said, thank you for your advice, you've been really helpful.
Agree. All my houses have wood flooring, under the kitchen.
Thanks. We aren't having underfloor heating, what else do you suggest, normal radiators or dehumidifier?
Also I must add it's engineered wood flooring - 16mm
What plumbers do you work with?! That's a long time. The kitchen is going on top of the flooring. Who puts the kitchen down before the flooring?!...
Okay what are the options to get it to dry quicker?
Thanks what are the options? In your opinion have you actually waited the full 2+ months for screed to dry?
Okay I'm not familiar with the terminology. I know floated as not on concrete - just wooden floorboards like T&G
It'll be laid on a membrane - unbonded
Thanks @merit we are not floating the floor or bonding the floor. Any other ideas how we can speed up the drying time? Does it really take 2 months?
Hi we need 63mm of screed before we lay engineered wood flooring. We are using standard screed and have seen that it dries 1mm a day. Do you...