Had this problem before with builders putting a smoothing compound down. What should happened was - Leave builders screed down and wait till moisture levels are under 75% RH then take a gamble and lay over it. Or remove the water mix , grind concrete , Apply 2 coat dpm and rescreed. Is any part of the 110m2 floor old concrete / quarry tiles ?