NX Floor Leveller on top of DPM

Discussion in 'Subfloor Preparation' started by GST, Sep 1, 2022.

  1. GST

    GST New Member

    2
    0
    1
    Hello,

    I need to level out my concrete kitchen floor, I was advised to put down a layer of DPM and then put the leveling compound on top

    Is this the correct method ? I wouldn't think it would bond to the DPM

    I'm using NX 3-50 floor leveller and the DPM would be 650-1000Gauge

    Would an SBR Primer be better

    I plan on putting down about 5mm thick compound.

    Any thoughts or advice would be greatly appreciated
     
  2. HC&F

    HC&F Well-Known Member

    232
    25
    28
    You’d need a moisture reading to determine weather or not a dpm is required. I’ve never had any experience with that compound, I would use a better one. There’s plenty to choose from
     
  3. dazlight

    dazlight Super Moderator

    6,839
    1,615
    113
    You would need a liquid Dpm like ardex DPM1c
     
  4. GST

    GST New Member

    2
    0
    1
    Thanks for the responses, much appreciated
     