Had a pre start meeting today, at the O2. Big site, over two floors, lots going on. Oh 37 degrees outside, full PPE..... 11 weeks to turn this into a trampoline park
Yes mate, they came back to me today. Absolute cheapest option, so a non starter on this one mate, sorry.
They went with isolator mate, was the cheapest of the options. Straight down would have uplifted itself in 6 months
I did try and get them to go with that, defiantly a better option. As always on contract, it came down to cost. The price you have that everlay for, is around what im paying for it, so a couple of quid over 1500 sq. added up to about 3k