  1. Neilydun

    Neilydun Well-Known Member

    2,859
    1,212
    113
  2. Spacey

    Spacey Super Moderator Staff Member

    6,516
    1,878
    113
    Nope ain't it another NA copy ?
     
  3. Neilydun

    Neilydun Well-Known Member

    2,859
    1,212
    113
    It is.
    Ive just won 100 bathrooms, and its on offer, but pallets only......
    Ive used Tremco before, and never got on with it, but that was there budget gear
     
  4. Rugmunching

    Rugmunching Well-Known Member

    3,679
    630
    113
    I hate all Tremco gear, they trying to sell a load cheap at my suppliers, think id rather use instarmac. o_O
     
  5. merit

    merit Well-Known Member

    8,003
    1,640
    113
    Wow, that’s bad
     
  6. Spacey

    Spacey Super Moderator Staff Member

    6,516
    1,878
    113
    Yeah I was never a tremco fan

    I'm sure there used to make 1C for ardex I may be wrong Something like that
     
  7. Neilydun

    Neilydun Well-Known Member

    2,859
    1,212
    113
    ha, I still like Instarmac. Just used 200 bags of there deep fill, and got 70 Renovation coming for next week.
    Had a few deep fill areas, and some were really deep
    Ive never got on with Tremco either, so maybe I won`t bother.
    upload_2020-11-7_8-26-13.png

    upload_2020-11-7_8-27-7.png

    upload_2020-11-7_8-29-23.png
     
  8. merit

    merit Well-Known Member

    8,003
    1,640
    113
    Maybe it’s designed to work on building sites lol. Every time I use it I have problems with it setting too fast. Sloppy
     
  9. Neilydun

    Neilydun Well-Known Member

    2,859
    1,212
    113
    I would agree its not the best out there, thats for sure. But, as you say, when were on site, rather than in someones house, budget is a major factor.
    A couple of quid a bag, if your sending pallet after pallet to site, could be the difference between winning the job.
    For the most part I really do find it ok, although I had a pallet of CL the other day and that went down very nicely.
    Laid 20 units of Green Bag last week, and to be fair that also went down lovely.
    Would probably look really good if I could use one of those stand up trowels :(
     
  10. Rugmunching

    Rugmunching Well-Known Member

    3,679
    630
    113
    Used to rate that level it 2 and Bond it when it first came on the scene, it was my 'go to' screed for the first few months then switched to CL which I rate one of the best flows out there. I still use instarmacs 'super 30' though.

    Used a dozen bags of 1200 couple weeks ago and I dont know why but just can't get on with the stuff, maybe I'm unlucky with batches but just dont get on with it.
     
  11. dazlight

    dazlight Super Moderator

    6,864
    1,620
    113
    Can’t see any other bag and bottle being as good as CL. It’s cheap and flows like a water mix
     
    • Like Like x 2
    • Agree Agree x 1
    • List
  12. Neilydun

    Neilydun Well-Known Member

    2,859
    1,212
    113
    I bought a pallet.
    Flows like water, but dries very weirdly.
    Like a film of water forms on the top, very strange.
     
  13. Silva21

    Silva21 Member

    15
    1
    3
    Anyone using gypsum screeds?
    Amazing flow, doesn't leave any trowel marks. Not even sure it's worth spike roller on it.
     
  14. Rugmunching

    Rugmunching Well-Known Member

    3,679
    630
    113
    Thats what I found with it, seem too light to push and loose.
     
  15. merit

    merit Well-Known Member

    8,003
    1,640
    113
    they flow amazing. Problem is they take ages to dry, Found them a bit soft too
     
  16. Neilydun

    Neilydun Well-Known Member

    2,859
    1,212
    113
    Yep, weird.
    Its only for en-suites, so can almost pour it in and walk away.
    I can leave it a few days before fitting on it, so will post again once its properly dry.
     
  17. Distinctive Adam

    Distinctive Adam Well-Known Member

    1,692
    497
    83
    Sell loads of gypsum screed.....prob cos we don’t do bag and bottle haha c30, f7, we do another one that dries in 12hrs which is bit more money
     