Been asked to do quite a bit of herringbone in the v4, 4 separate areas all 19m2 each. I'm ardex 1c'in them all but the fitting m2 rate I'm wondering what the going rate for herringbone wood is? Last time I did this type of work I charged £26m2
Depends on how many ins and outs there are in the room, a lot of the time, it's just as easy putting a border in. Is it the v4 zig zag?
Yes the v4 bevelled edge planks. Ive always done border first with the engineered wood but was thinking is there a plus to doing the field first?
I usually fit the field first, then just run round the edges with a plunge saw and sometimes a router in doorways or cut short runs straight before i fit them, i prefer to run the border pieces through the table saw first, so I'm butting square edge to square edge