Because I need to lay something solid over the floorboards before underlay don't I? Screed drying times: seems to be a lot of conflicting info...
Thanks for the info. Too late as the screed is at the level of the top of the floorboards. So, perhaps the only way to bring the screed area up to...
DIY job so asking lots of questions! Extension screed has just been done and is level with the subfloor in two knocked through rooms. Screeders...
Thanks guys. I'll have to split the difference and go for 4.5mm :). Actually there will be two walls knocked through and the flooring will be...
Thanks guys, great advice. Now, I thought buying ply to go on top of the floorboards would be simple.... The floorboards are sound and pretty...
I thought sealing the plinth line would create a pain for future removal, but it would look weird if I only siliconed the end panels and around...
Brilliant! And seal along the plinth line as well?
Thank you. And silicon seal around?
Thanks all. Looks like I will have to bite the bullet and lay click vinyl up to the units. (I have laid several click laminate rooms over the...
Yes DIY as on a tight budget (missus has blown it all on the kitchen!). Looking at either click step type vinyl or 2 metre sheets.
Having kitchen/dining room knocked through and both extended. I want one vinyl floor throughout (approx 40m2). Dining room and kitchen have wood...