I've done it with a couple of bedrooms, using flex pro sticky underlay, that was about 5years ago and no issues with it
It might be worth seeing if it can be asphalted,would probably cost around £25sqm and would be done and useable in a day
Same process each time with edge sander
I'd probably start 36g,60g,80g,possibly 100g,then finish sander 120g,then 120g diamond
Should have taken at least 3 grits of sandpaper, that's 3 times with the drum sander, before they got to the finishing machines
Could you tell how many times they went over the floor with the belt sander?
Was just wondering if they had used a hire sander
Also, the picture framing round the edges is probably caused by the sanding pattern of the two different types of machine, which is why they...
That is awful, looks like it needed going over with the belt sander again, then a finishing sander such as an orbital. Just out of curiosity, did...
Might give janser a go,have been using concave for most cuts and straight for miters, mainly because the straights blunt quickly and having...
I've noticed that too, especially when cutting underlay, i end up checking if I've just put a used blade in
Boen
Born do a 3strip 14mm cherry
Normally up to about 15,any more than that i'm normally taking the big buckets aswell, so take the big van
Looks like cherry, could possibly be khars, worth checking quickstep too
Connect, got 7ft in the back and 3m will fit diagonally and into the footwell
Just cut them in half, if it's a big ply job then i use the sprinter on the first day, just a pity the connect isn't a foot longer
I use a lwb transit connect most of the time, plenty of room for laminate and lvt jobs,can even get 3m vynil in, plus it's economical, my sprinter...
If it's just tiles with one strip between each one, then it's the same as straight lay, after that i tend to look at each job and add extra of...
I'm charging £23 for straight lay that includes labour for prep,£25 for border