If you can downloads tapatalk forum app. Easy to post pics from that. Welcome mate.
You not doing the nails mate. They aren't in related items?
Isn't it best to sort the floorboards out 1st like when plying over? I sand them down if needed or ever screed over and bad cupping.
That's the direction they will be going. The long way. Why do you say that?
Anyone used any maroon / dark red design strips? Need some 10mm wide if there is any. On hol so can't look through the brochures.
Boxes will do you john. Used them for years with no issues.
Is that ok on floorboards
Cheers lads.
Pricing a job for V4 engineered wood over floorboards which are very flat What underlay should I use? I've only gone over concrete before with...
What ply was it? Where was it from?
Alright mate. Welcome to the forum !!!!!
What sizes do they do Pete ? This job is 800m2
Which one do you use? How do you put it on? Got a big carpet tile job next week and only have one 25 ltr laybond tackifier so need some more....
Can you ply over it john?
Always thought they would cancel each other out. Can see it going to pens.
It was better when it was made in Chester fur to the soft water in Wales they used it the factory.
I can't SEE how a blind company can do it cheaper?
Wickes screed was made at Laybond but not sure now.
NA can go on as a scratch cost under a dpm.
Great finish on it [ATTACH]