Hi all, The situation is this. Need to level out a 3mtr x 2mtr workshop. the floor dips in the middle a little, 3-4mm. the question I have is this. As per the norm, loads of advice from people who aren't in the profession. I have 3 x 25kg bags of Mapei Ultra plan 3240. Roll of Industrial rubber flooring 3mm thick.(to go on top of screed) Should I add the Mapei Liquid Latex to the mixing?? If No, Why? (mainly for personal knowledge) If Yes, What are the benefits? (fairly heavy machinery being installed. Mid-level Milling machine, Lathe and a small Surface Planer) Thanks in advance
Dont add latex You mix it with water You need to do a moisture test on the slab first before you do anything It may need a DPM
@Spacey Thanks for getting back to me. A moisture test might be kinda redundant now as the whole thing has been sealed with deep penetration epoxy resin. It's water tight and I have also brushed a 2" wide rubber paint around the border to create a watertight seal and the outside has the bitumen paint sealant around the outside to seal it there. I love a bit of overkill